• en
  • fr

Quiberon-Belle Isle 4 project for ERDF

Louis Dreyfus Travocean has just completed, for ERDF, the laying of a hybrid cable between Quiberon and Belle Isle. This cable will be used to power Belle Isle electrical and optical fiber (very high speed).

2015-Quiberon Belle Ile-1The operations began on the 10th of March 2015 on the beach in Quiberon and ended on the 12th of March on the beach in Belle Isle, with a length of 14.5 km of cable laid between the two shore ends.

Read More