LDTVO is moving into its new offices

photobureaux-2Louis Dreyfus Travocean is moving into its new offices in La Ciotat on October 24th 2016.

Please note our new address :

Zone Athélia 5 – 78 avenue des grenadiers – 13600 LA CIOTAT

Mail, phone and fax numbers remain unchanged.

Read More

Ongoing operations for our ROVs LEOPARD and ROVJET810

Our 2 new ROVs LEOPARD were mobilized in May 2016 onboard the SIEM AIMERY (belonging to our customer Siem Offshore Contractors), with our ROVJET 810.

Since its mobilization, ROVJET810 has successfully completed the trenching of 59 cables with a total length of 62 km. The two work ROVs have provided assistance to the vessel’s operations : touchdown monitoring during cable laying, cable pulling in the turbine foundations, or installation of gravel bags.

2016-siem-1

Read More

Sports challenge for Louis Dreyfus Travocean

From 27 until 30 May 2016, the Louis Dreyfus TravOcean’s Sailing Club will participate in his first race, the 37th Petrol Cup sailing competition.

The 16 crews from French Oil and Gas companies will compete in the harbor of Marseille and around the Frioul Island.

The Louis Dreyfus TravOcean’s crew will consist of 9 persons who will make rotations to fill the 7 positions onboard their sailboat “Grand Surprise”.

Read More

Fitzroy Darwin project in Australia

2016-Darwin-3In February 2016, Louis Dreyfus Travocean performed for Alcatel Lucent Submarine Networks Ltd a Direct shore end landing in Darwin for the Fitzroy project.

Darwin is located in Australia, Northern Territory. The Fitzroy project is a fiber optic network between Darwin and Port Hedland for the Australian operator Nextgen with links to oil and gas platforms of the North West. Louis Dreyfus Travocean has previously performed the 2x44km separate shore end landing in Port Hedland, Western Australia, late 2015.

 

Darwin shore end consists of 3 kilometers of fiber optic cable installed from shore to a 20m water depth area through a 1 kilometer directional drill.

The installation was performed using a 16 meters x 7 meters barge locally chartered, fitted with 2 thrustmasters units. The work site, located just outside Darwin Harbor, is characterized by a strong tidal current and changing weather conditions at this time of the year. Crossing the Mindil beach dry sand bar, right on the cable route, was also a challenge for this operation.

Once cable installed on the pre-defined route, the barge has been modified and the TO Mobile trencher was mobilized onboard. TO Mobile is a dedicated crawler fitted with jetting system. This machine is operated from surface and the water jets are powered with a powerful pump on the barge allowing for the 2 meters burial depth target to be reached where the cable was not protected by HDD.

Schedule : January/February 20162016-Darwin-4

Read More

Sea Lion Rostock project

2015-Rostock-2Louis Dreyfus Travocean has been contracted by Alcatel-Lucent Submarine Networks Ltd to perform the laying and burial operations of 2 sections of fibre optic cable for the Sea Lion system linking Santahamina in Finland to Rostock in Germany in the Baltic sea.
The two portions of cables are the following:

  • Rostock, Germany, 9.7 Km: separate shore-end, laying, post burial and installation of articulated pipes.
  • Gedser Bank, Denmark, 8.2 Km: laying and post burial in low water depths

Louis Dreyfus Travocean performed the following activities:

  • Engineering and project management
  • Mobilisation in Dunkirk of ROVJET404 onboard the vessel DPV Supporter
  • Offshore operational phase:
    • Loading of the 2 lengths of cable in Calais
    • Transit to Gedser Bank, Denmark / Calibrations and tests
    • Installation and burial on Gedser Bank’s site
    • Transit to Rostock
    • Installation, protection and burial on Rostock’s site
    • Transit to Dunkirk
  • Demobilisation of equipment
  • Project documentation and final report including depth of burial for each section of cable.

Schedule : November 2015 to January 2016

Read More

BBG FUJAIRAH – Direct shore end in UAE

2016-Fujairah-4BBG is a 9 Segment repeatered cable system that routes from Malaysia to the UAE with a number of landings in Malaysia, India, Sri Lanka, Oman and UAE.

TravOcean Middle East has been awarded the contract by Alcatel Lucent to provide beach support services for the landing and cable protection works at Fujairah shore end (UAE).

The scope of work was:

  • To perform preparatory works on the beach.
  • To assist the main lay vessel for cable pulling operations – pull the cable from the Main Lay Vessel to the BMH.
  • To perform a post lay diver swim video survey.
  • To bury the cable on the beach as specified using excavators on sand conditions.
  • To install artic pipes and bury the cable at 2m target depth by jetting in soft soil conditions where feasible.
  • To install earth plates systems.
  • To perform a post-burial diver swim video survey.
  • To document the as-laid/as buried position of the cables as required.

These operations were performed between 31st December 2015 and 12th January 2016.

Read More

LDTVO BUYS 2 SAAB SEAEYE LEOPARDS

SEAEYE LEOPARD-SAABLouis Dreyfus Travocean has recently ordered two SAAB SEAEYE LEOPARDS.

Read more :  What’s New – Louis Dreyfus TravOcean order two Saab Seaeye Leopards

Read More