2015-AbuAli-2TRAVOCEAN Middle East has been contracted by Mc DERMOTT ARABIA COMPANY Ltd to provide the Cable Trenching Personnel and Equipment to carry out the trenching of 2 x 230 kV cables from Abu Ali Island to Khursaniyah fields shore in the Arabian Gulf.

Louis Dreyfus Travocean TM03 trenching spread has been mobilized on the INT 406 cable installation barge in Jebel Ali in March 2015.

The trenching operations were performed between April and June 2015 and a total of 2 x 5.9 km of cable was buried, in maximum 11 m water depth LAT.