2018 INDIGO

Post lay inspection and burial of 39 km of fibre optic cable.

Location : Indonesia
Client : Optic Marine Services Iternational Ltd

Product : Fibre optic cable 
Length (km): 39
Water depth (m) : up to 100 m
Vessel : DP Vessel
Burial system : ROVJET 605 (jetting)
Burial depth (m) : 1.5
Read More

2018 ASC Indonesia

Post lay inspection and burial of 41 km of fibre optic cable.

Location : Indonesia
Client : Optic Marine Services Iternational Ltd

Product : Fibre optic cable 
Length (km): 41
Water depth (m) : up to 100 m
Vessel : DP Vessel
Burial system : ROVJET 605 (jetting)
Burial depth (m) : 1.5
Read More

2018 TRIANEL BORKUM II OWF

Provision of personnel and equipment to carry out the post lay burial of 18 infield power cables.

Location : Trianel Borkum II Offshore Windfarm / German waters
Client : Seaway Offshore Cables

Product : Power Cable 
Length (km): 27
Water depth (m) : up to 33 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 1.7
Read More

2018 IFA 2000 CABLES REPAIR

Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.

Location : Sangatte (France)
Client : NATIONAL GRID

Water depth (m) : -5 to 1 LAT
Vessel : jack-up barges
Burial system : ROVJET806 (jetting) + RS1 (Massflow)
Burial depth (m) : up to 2.5
Product : Power Cable
Weight (kg/m) : 33
Diameter : 105 mm

Read More

2018 ASC Perth

1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.

Location : Perth / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable 
Length (km): 10
Water depth (m) : up to 25 m
Vessel : Barge
Burial system : TO Mobile (jetting)
Burial depth (m) : 1
Weight (kg/m) : 2.8
Diameter (mm) : 37.5
Read More

2018 MERKUR OWF

Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.

Location : Merkur Offshore Windfarm / Germany 
Client : Seaway Offshore Cables

Product : Power Cable 
Length (km): 59
Water depth (m) : up to 30 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 1.5
Read More

2017 BEATRICE OWF

Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.

Location : Beatrice Offshore Windfarm / North sea 
Client : Seaway Offshore Cables

Product : Power Cable 
Length (km): 93
Water depth (m) : up to 55 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 0.8
Read More

2017 SAFANIYA 5

Provision of personnel and equipment to carry out the simultaneously trenching of five 15 kV submarine power cables on Safaniya 5 field.

Location : Safaniya 5 field – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 22 km
Water depth (m) : 10-15
Vessel : Barge
Burial system : TM03 (trencher)
Burial depth (m) : 1
Weight (kg/m) : 19
Diameter (mm) : 100
Read More

2017 LTAII

Provision of personnel and equipment to carry out trenching services on four 115 kV submarine power cables on Berri field + one 115 kV and five 15 kV submarine power cables on Safaniya field.

Location : Berri and Safaniya fields – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 16 + 15 km
Water depth (m) : 0 to 6
Vessel : Barge
Burial system : TM03 + TM04 (trenchers)
Burial depth (m) : 1
Weight (kg/m) : up to 83
Diameter (mm) : up to 218
Read More

2017 QUINTILLION ALASKA

1 separate shore end. 16 km cable installation with laying and burial.

Location : Prudhoe Bay/ Alaska
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable 
Length (km): 16
Water depth (m) : up to 15 m
Vessel : Barge
Burial system : ESV12 (Vibrating plough)
Burial depth (m) : 2
Weight (kg/m) : 4
Diameter (mm) : 37.5
Read More