
Louis Dreyfus Travocean has just completed, for ERDF, the laying of a hybrid cable between Quiberon and Belle Isle. This cable will be used to power Belle Isle electrical and optical fiber (very high speed).
The operations began on the 10th of March 2015 on the beach in Quiberon and ended on the 12th of March on the beach in Belle Isle, with a length of 14.5 km of cable laid between the two shore ends.