• en
  • fr

WASIT trenching project in Saudi Arabia

The Wasit project work includes the engineering, procurement, fabrication, transportation and installation of one (1) composite submarine cable (15-kV power with an internal fiber optic core) from shore at Abu Ali to the intermediate injection platform ARBI TP-2, with a total length of 30.8 km.

2015-WASIT-News2 [1600x1200]

In January 2015, Louis Dreyfus Travocean trenched this 15 kV export cable for Mermaid Subsea Services (ex Subtech Qatar) and Saipem / SAudi Aramco as final client. Our TM04 trencher fitted with the 1.3 m cutting wheel has been mobilised onboard Mubarak Carrier barge and the trenching has been completed from 9.2 km up to the shore.