Home » Projets » 1999 DCN TOULON

1999 DCN TOULON

Power and composite cables inside miltary harbour.

Location : FRANCE / TOULON
Client : ALCATEL CABLE / DCN

Length (km): 5,8
Water depth (m) : 12
Vessel : Inflatable / works craft
Burial system : N.A.
Burial depth (m) : N.A.
Product : Composite
Weight (kg/m) : 15
Diameter : 88 mm

Other projects

  • 2023 BLUE MARSEILLE

    1 x Reverse Shore end in Marseilles , laying of seagrass anchors, laying of sinks, post-silting
    Burial system :
    Plus d’infos
  • 2015 BALTIC 2

    Provision of personnel and equipment to carry out the post burial of 75 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos