2001 SAT 3

DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable

Location : CAMEROON and GABON
Client : SAT 3 WASC (ALCATEL SUBMARINE NETWORKS)

Length (km): 79
Water depth (m) : 20
Vessel : Barge
Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 5,8
Diameter : 46 mm