Home » Projets » 2000 FLAG ATLANTIC 1

2000 FLAG ATLANTIC 1

3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.

Location : CORNWALL and FRENCH BRITTANYcoasts
Client : FLAG Atlantic 1 Interlink & South segment (ALCATEL SUBMARINE NETWORKS)

Length (km): 53,5
Water depth (m) : 55
Vessel : Barge
Burial system : MED1 (Jetting) and ESV11 (Plough)
BD (m) : 1,4 to 3
Product : Fibreoptic cable
Weight (kg/m) : 1,8
Diameter : 31 / 46 mm

Other projects

  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)
    Plus d’infos