Home » Projets » 2005 FALCON

2005 FALCON

Separate shore ends / Laying and burial of FO cable

Location : Dubaï -Qatar – Barhain – Iran – Saudi – Yemen
Client : Alcatel Submarine Networks

Length (km): 228
Water depth (m) : 12
Vessel : Barge
Burial system : TJV05 – EBJ03 (Jetting)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 4
Diameter : 35,9 mm

Other projects

  • 2023 MUANDA

    Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2022 HORNSEA 2

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2022 MAPUTO

    Separate landing in Maputo. Laying and post-wiring of 42 km of fiber-optic cable
    Burial system :
    Plus d’infos