Home » Projets » 2000 VNF LILLE

2000 VNF LILLE

Along river – canal /1 telecommunication fibre optic cable.

Location : FRANCE
Client : LILLE (Telecom Operators / LD COM NETWORKS)

Length (km): 3,2
Water depth (m) : 10
Vessel : River Barge
Burial system : Machine LD CABLE : Towed plough
Burial depth (m) : 0,7
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 25 mm

Other projects

  • 2013 AMX COLOMBIA

    2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
    Burial system : EBJ (jetting)
    Plus d’infos
  • 2024 2 AFRICA PEARLS

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2010 MANIFA

    Provison of technical and engineering services / Cable laying and trenching services.
    Burial system : TM04 (Trencher)
    Plus d’infos