Home » Projets » 2002 FLAG SOUTH PLIB

2002 FLAG SOUTH PLIB

PLIB works on telecommunication fibre optic cable

Location : FRENCH BRITTANY coasts / FLAG Atlantic 1 South segment
Client : ALCATEL SUBMARINE NETWORKS

Length (km): 11,2
Water depth (m) : 60
Vessel : DP Vessel
Burial system : MED1 (Crawler fitted with dredge pump)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 56 mm

Other projects

  • 2009 IMEWE/MENA/TEN/EIG

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : TO Mobile
    Plus d’infos
  • 2020 Partnership with UXO Control

    Offshore campaign to identify and eliminate unexposed ammunition (UXO) on the site of the Saint-Brieuc wind farm
    Burial system : TRITON XLX200HP and ROV C 113
    Plus d’infos
  • 2014 PERENCO RDC CONGO

    Laying of 43 km of power cable between mainland / platforms and platforms.
    Burial system : ROVJET806 + EBJ (jetting)
    Plus d’infos