Home » Projets » 2002 FLAG SOUTH PLIB

2002 FLAG SOUTH PLIB

PLIB works on telecommunication fibre optic cable

Location : FRENCH BRITTANY coasts / FLAG Atlantic 1 South segment
Client : ALCATEL SUBMARINE NETWORKS

Length (km): 11,2
Water depth (m) : 60
Vessel : DP Vessel
Burial system : MED1 (Crawler fitted with dredge pump)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 56 mm

Other projects

  • 2022 2 AFRICA Spain

    1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2025 PEARLS CABLE STORAGE

    Storage of fiber optic cable and repeaters in Bahrain
    Burial system :
    Plus d’infos