Home » Projets » 2002 FLAG SOUTH PLIB

2002 FLAG SOUTH PLIB

PLIB works on telecommunication fibre optic cable

Location : FRENCH BRITTANY coasts / FLAG Atlantic 1 South segment
Client : ALCATEL SUBMARINE NETWORKS

Length (km): 11,2
Water depth (m) : 60
Vessel : DP Vessel
Burial system : MED1 (Crawler fitted with dredge pump)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 56 mm

Other projects

  • 2025 CSN-1 COLOMBIA

    Separate landing in Barranquilla. Laying and post-wiring of 8.5 km of fiber optic cable, Installation of grounding system
    Burial system :
    Plus d’infos
  • 2020 JOHAN SVERDRUP 2

    Post lay burial of seismic fibre optic cable in Johan Sverdrup Field (Equinor)
    Burial system : ROVJET 1206
    Plus d’infos
  • 2001 SAT 3

    DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable
    Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
    Plus d’infos