2021 YUNLIN OWF
Provision of personnel and equipment to carry out the post lay burial of infield array cables.
Place: YUNLIN OWF Taiwan
Client : Seaway 7
Product : Powercable
Length (km): 14
Water depth (m) :up to 50 m
Vessel : DP Vessel
Burial system :ROVJET1206 (jetting)
Burial depth (m) : 1.5
Period: July-nov 2021