Home » Projets » 2005 ORASCOM MED CABLE

2005 ORASCOM MED CABLE

MED CABLE direct shore ends (FO)

Location : Mediterranean Sea
Client : Alcatel Submarine Networks

Length (km): 3,75
Water depth (m) : 12
Vessel : Pontoon
Burial system : TJV07 (Jetting)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 46 mm

Other projects

  • 2011 ACE – SENEGAL

    2 direct FO shore-ends in Dakar (Senegal). Protection of cable (burial, articulated pipes, grout bags)
    Burial system : EBJ (Jetting)
    Plus d’infos
  • 2023 GHANA

    Separate landing in Accra. Laying and post-wiring of 4.9 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos