Separate landing in Accra. Laying and post-wiring of 4.9 km of fiber optic cable

Location: Accra Ghana
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 4.9 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2023 ZAKYNTIS

    LD Travocean was subcontracted by Asso Subsea for trenching work. ROVJET 1217 was deployed on the TSV MV Astrea to carry out PLB water jet cleaning on the 21 km electrical interconnection.
    Burial system :
    Plus d’infos
  • 2014 EMF Trials in situ

    Performance of trenching trials for the construction works of the French offshore windfarms.
    Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
    Plus d’infos
  • 2016 AL NASR QAFFAY

    Cable laying and burial between mainland and Qaffay Island.
    Burial system : TM04 (trenching)