Home » Projets » 2010 MANIFA

2010 MANIFA

Provison of technical and engineering services / Cable laying and trenching services.

Location : Manifa oil field
Client : Valentine Maritime Saudi Ltd

Length (km): 29,2
Water depth (m) : 11
Vessel : Barge
Burial system : TM04 (Trencher)
Burial depth (m) : 1
Product : Power cable