Home » Projets » 2010 MANIFA

2010 MANIFA

Provison of technical and engineering services / Cable laying and trenching services.

Location : Manifa oil field
Client : Valentine Maritime Saudi Ltd

Length (km): 29,2
Water depth (m) : 11
Vessel : Barge
Burial system : TM04 (Trencher)
Burial depth (m) : 1
Product : Power cable

Other projects

  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2001 ANTARES

    Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).
    Burial system : N.A.
    Plus d’infos
  • 2025 CSN-1 PANAMA

    Separate landing at Costa del Este. Laying and post-wiring of 11.8 km of fiber optic cable
    Burial system :
    Plus d’infos