Home » Projets » 2012 CAT – THAÏLAND

2012 CAT – THAÏLAND

2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.

Location : Sri Racha and Songkhla / Gulf of Thailand
Client : ALCATEL LUCENT

Length (km): 27
Water depth (m) : 28
Vessel : Barge
Burial system : EBJ 04 + ESV12 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable

Other projects

  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos
  • 2020 TANNAT and MALBEC Systems

    Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina). Installation of shells.
    Burial system : ROVJET 404
    Plus d’infos
  • 2017 BEATRICE OWF

    Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos