Home » Projets » 2017 QUINTILLION ALASKA

2017 QUINTILLION ALASKA

1 separate shore end. 16 km cable installation with laying and burial.

Location : Prudhoe Bay/ Alaska
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable 
Length (km): 16
Water depth (m) : up to 15 m
Vessel : Barge
Burial system : ESV12 (Vibrating plough)
Burial depth (m) : 2
Weight (kg/m) : 4
Diameter (mm) : 37.5

Other projects

  • 2016 MARJAN GOSP

    Provision of personnel and equipment to carry out the post-lay burial of one 115 kV power cable.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos
  • 2022 HORNSEA 2

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos