2018 IFA 2000 CABLES REPAIR

Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.

Location : Sangatte (France)
Client : NATIONAL GRID

Water depth (m) : -5 to 1 LAT
Vessel : jack-up barges
Burial system : ROVJET806 (jetting) + RS1 (Massflow)
Burial depth (m) : up to 2.5
Product : Power Cable
Weight (kg/m) : 33
Diameter : 105 mm