Home » Projets » 2016 FITZROY Darwin

2016 FITZROY Darwin

1 separate shore end. 3km cable installation with laying and post burial.  Installation of articulated pipes.

Location : Darwin / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 3
Water depth (m) : up to 20 m
Vessel : Barge
Burial system : TO Mobile (jetting)
Burial depth (m) : 2
Weight (kg/m) : 3.5
Diameter (mm) : 35

Other projects

  • 2004 SIR BANIYAS

    Lay and burial of 2×9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2023 GHANA 2

    Recovery and replacement of damaged Ace cable in Accra. Laying and post-wiring of 5 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2022 MAPUTO

    Separate landing in Maputo. Laying and post-wiring of 42 km of fiber-optic cable
    Burial system :
    Plus d’infos