Home » Projets » 2016 FITZROY Darwin

2016 FITZROY Darwin

1 separate shore end. 3km cable installation with laying and post burial.  Installation of articulated pipes.

Location : Darwin / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 3
Water depth (m) : up to 20 m
Vessel : Barge
Burial system : TO Mobile (jetting)
Burial depth (m) : 2
Weight (kg/m) : 3.5
Diameter (mm) : 35

Other projects

  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2012 THORNTON BANK

    Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.
    Burial system : ROVJET605 + ROVJET806 (jetting)
    Plus d’infos
  • 2016 BBG FUJAIRAH

    1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes)
    Burial system : EBJ (jetting)
    Plus d’infos