Home » Projets » 2024 MARSEILLE

2024 MARSEILLE

1 x Direct landing in Marseille, installation of shells, post-sinking, installation of posidonia anchors. Installation of grounding system

Location: Marseille FRANCEt
Customer: SUBCOM

Length (km): 1.7 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2.0 m
Product : Fiber Optic Cable
cable type: ø37mm

Other projects

  • 2001 SAT 3

    DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable
    Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
    Plus d’infos
  • 2025 2 AFRICA PEARLS

    Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 1996 THAILANDE

    Mainland to KO SAMUI Island /Laying and burial of 115 kV power cable
    Burial system : TM02 (Trencher) – TJV04 (Jetting)
    Plus d’infos