Home » Projets » 2024 MARSEILLE

2024 MARSEILLE

1 x Direct landing in Marseille, installation of shells, post-sinking, installation of posidonia anchors. Installation of grounding system

Location: Marseille FRANCEt
Customer: SUBCOM

Length (km): 1.7 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2.0 m
Product : Fiber Optic Cable
cable type: ø37mm

Other projects

  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2025 2Africa PEARLS

    Direct landing in Kalba (United Arab Emirates), installation of protection shells, and post-burial of 2.3 km of fiber optic cable.
    Burial system :
    Plus d’infos
  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :
    Plus d’infos