Home » Projets » 2025 2Africa PEARLS

2025 2Africa PEARLS

Direct landing in Kalba (United Arab Emirates), installation of protection shells, and post-burial of 2.3 km of fiber optic cable.

Location: Kalba – United Arab Emirates
Client: ASN
Year: December 2025

Length (km): 2.3 km
Burial System: EBJ
Product: Fiber Optic Cable

Other projects

  • 2024 NIGERIA

    Separate landing in Lagos. 2.8 km of fiber-optic cable submerged in water
    Burial system :
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2022 2 AFRICA Spain

    1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos