Home » Projets » 2025 2 AFRICA PEARLS

2025 2 AFRICA PEARLS

Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable

Location: Al Khobar, Kingdom of Saudi Arabia
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 35 km
Water depth (m) :
Vessel: BARGE DP
Trenching system: TO MOBILE
Trenching depth (m): 2m
Product: Fiber optic cable
cable type: ø37mm

Other projects

  • 2005 SEA-ME-WE 4

    Direct shore ends / Laying and burial of FO cable
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2000 PEC / LEVEL 3/ FLUTE

    PLIB works on telecom fibre optic cable crossings.
    Burial system : MED 1: Dredge pump / jetting tool
    Plus d’infos
  • 2018 TRIANEL BORKUM II OWF

    Provision of personnel and equipment to carry out the post lay burial of 18 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos