Home » Projets » 2025 2 AFRICA PEARLS

2025 2 AFRICA PEARLS

Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable

Location: Al Khobar, Kingdom of Saudi Arabia
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 35 km
Water depth (m) :
Vessel: BARGE DP
Trenching system: TO MOBILE
Trenching depth (m): 2m
Product: Fiber optic cable
cable type: ø37mm

Other projects

  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2022 2 AFRICA MARSEILLE

    2 x Direct landing in Marseilles. Shell installation
    Burial system :
    Plus d’infos
  • 2024 NIGERIA

    Separate landing in Lagos. 2.8 km of fiber-optic cable submerged in water
    Burial system :
    Plus d’infos