2025 2 AFRICA PEARLS

Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable

Location: Al Khobar, Kingdom of Saudi Arabia
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 35 km
Water depth (m) :
Vessel: BARGE DP
Trenching system: TO MOBILE
Trenching depth (m): 2m
Product: Fiber optic cable
cable type: ø37mm

Other projects

  • 2006 THAILAND KHO SAMUI

    Shore ends/Mainland to island/Laying and burial of 115 kV power cable
    Burial system : TJV05 – TJV08 (Jetting)
    Plus d’infos
  • 2016 FITZROY Darwin

    1 separate shore end. 3km cable installation with laying and post burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2023 GABON

    Separate landing in Libreville. Laying and post-wiring of 16.9 km of fiber optic cable
    Burial system :
    Plus d’infos