Home » Projets » 2024 NIGERIA

2024 NIGERIA

Separate landing in Lagos. 2.8 km of fiber-optic cable submerged in water

Location: Lagos, NIGERIA
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 2.8 km
Water depth (m):
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product: Fiber-optic cable
Cable type: ø37 mm

Other projects

  • 2020 HAVHINGSTEN System

    Laying and burial of 1 fiber optic cable in Blackpool (UK) and 2 fiber optic cables in Houstrup (Denmark).
    Burial system : TO Mobile NV
    Plus d’infos
  • 2003 ILE D’YEU

    Mainland to island / Shore ends / Laying and burial of 20 kV pc
    Burial system : N.A.
    Plus d’infos
  • 2023 CONGO

    Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable
    Burial system :
    Plus d’infos