Home » Projets » 2023 HKZ Project

2023 HKZ Project

Assistance to laying, PLIB

Location: UK Northesea
Customer: SEAWAY 7

Length (km): 292 km
Water depth (m) :
Vessel: Seaway AimeryS
Beaching system: ROVJET 1210
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 1996 THAILANDE

    KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable
    Burial system : TM02 (Trencher) – TJV04 (Jetting)
    Plus d’infos
  • 2017 BEATRICE OWF

    Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos
  • 2003 AL KHAFJI

    Laying and burial of 40 km of power cable in Saudi Arabia.
    Burial system : TM02 (Trencher)
    Plus d’infos