2007 ATLAS OFFSHORE

FO cable shore ends – Post lay burial

Location : ASILAH – MOROCCO
Client : ALCATEL LUCENT

Length (km): 1,7
Water depth (m) : max 20
Vessel : Pontoon
Burial system : EBJ 04 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable

Other projects

  • 2026 CSN-1 (USA)

    Mobilization of the DP vessel Sarah Bordelon in Houma (Louisiana), followed by transit to Florida. Separate shore landing at Bonita Springs, lay and post-lay burial of 30 km of fiber optic cable, followed by a PLIB over approximately 100 km.
    Burial system :
    Plus d’infos
  • 2017 QUINTILLION ALASKA

    1 separate shore end. 16 km cable installation with laying and burial.
    Burial system : ESV12 (vibrating plough)
    Plus d’infos
  • 2014 GÉOCEAN BÉNIN

    Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
    Burial system : EBJ (jetting)
    Plus d’infos