Home » Projets » 2007 ATLAS OFFSHORE

2007 ATLAS OFFSHORE

FO cable shore ends – Post lay burial

Location : ASILAH – MOROCCO
Client : ALCATEL LUCENT

Length (km): 1,7
Water depth (m) : max 20
Vessel : Pontoon
Burial system : EBJ 04 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable

Other projects

  • 2024 NIGERIA

    Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water
    Burial system :
    Plus d’infos
  • 2015 WASIT

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM04 (trenching)
    Plus d’infos
  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos