Home » Projets » 2000 FLAG ATLANTIC 1

2000 FLAG ATLANTIC 1

3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.

Location : CORNWALL and FRENCH BRITTANYcoasts
Client : FLAG Atlantic 1 Interlink & South segment (ALCATEL SUBMARINE NETWORKS)

Length (km): 53,5
Water depth (m) : 55
Vessel : Barge
Burial system : MED1 (Jetting) and ESV11 (Plough)
BD (m) : 1,4 to 3
Product : Fibreoptic cable
Weight (kg/m) : 1,8
Diameter : 31 / 46 mm

Other projects

  • 2000 Dumpton Gap – Level 3

    Remedial work : Lay and simultaneous burial of fibre optic cable.
    Burial system : ESV11 (Plough)
    Plus d’infos
  • 2023 BLUE MARSEILLE

    1 x Reverse Shore end in Marseilles , laying of seagrass anchors, laying of sinks, post-silting
    Burial system :
    Plus d’infos
  • 2015 AMRUMBANK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET810 (jetting)
    Plus d’infos