Home » Projets » 2021 EAUFON

2021 EAUFON

Separate shore ends in Chisasibi river. Laying and burial of 19 km of fibre optic cable. Installation of articulated pipes .

Place: Chisasibi (Québec)
Client : Alcatel Submarine Networks (ASN)

Product : fibre optic cable
Length: 19 km
Depth: Up to 15 m
Ship: DP Pontoon
Burial system: TO MOBILE
Burial depth: 1 m

Period: August 2021

Other projects

  • 2023 MUANDA

    Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2022 2 AFRICA SOUTH AFRICA

    1 x Direct landing at Duynfontein, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2008 DELMA

    Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
    Burial system : TM04 (Trencher)
    Plus d’infos