2021 EAUFON

Separate shore ends in Chisasibi river. Laying and burial of 19 km of fibre optic cable. Installation of articulated pipes .

Place: Chisasibi (Québec)
Client : Alcatel Submarine Networks (ASN)

Product : fibre optic cable
Length: 19 km
Depth: Up to 15 m
Ship: DP Pontoon
Burial system: TO MOBILE
Burial depth: 1 m

Period: August 2021