Home » Projets » 2003 IFA 2000 – CABLE 11 REPAIR

2003 IFA 2000 – CABLE 11 REPAIR

500 MW HVDC Power cable repair.

Location : FRANCE to ENGLAND Channel
Client : RTE

Length (km): 0,6
Water depth (m) : 25
Vessel : Barge
Burial system : MED1 (Dredge pump)
Burial depth (m) : 0,6
Product : Power Cable
Weight (kg/m) : 35
Diameter : 108 mm

Other projects

  • 2012 THORNTON BANK

    Post-Lay burial of the export power cable of the Thornton Bank Offshore Windfarm.
    Burial system : ROVJET605 + ROVJET806 (jetting)
    Plus d’infos
  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos
  • 2022 2 AFRICA Spain

    1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos