2011 KASHAGAN

Provison of burial services for 4 power and FO cables and 6 umbilicals.
Location : Kashagan oil field – Kazakhstan
Client : SONSUB (for SAIPEM)
Length (km): 41
Water depth (m) : 4
Vessel : Barge
Burial system : TM03 (Trencher) + ESV12 (Plough)
Burial depth (m) : 2
Product : FO cable / Power cable
Weight (kg/m) : max 30.8 
Diameter : max 171 mm