2016 AL NASR QAFFAY

Cable laying and burial between mainland and Qaffay Island.

Location : United Arab Emirates
Client : Al Nasr Contracting Company L.L.C.

Length (km): 40
Water depth (m) : 0-10
Vessel : Barge
Burial system : TM 04 (trenching)
Burial depth (m) : 1
Product : Power Cable (33 kV)
Weight (kg/m) : 41
Diameter : 141 mm