2020 Dunant
Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
Location : Saint Hilaire de Riez / France
Client : Subcom
Product : Fibre optic cable
Length (km): 5
Water depth (m) : up to 15 m
Vessel : DP Vessel
Burial system : TO Mobile NV (jetting)
Burial depth (m) : 1
Length (km): 5
Water depth (m) : up to 15 m
Vessel : DP Vessel
Burial system : TO Mobile NV (jetting)
Burial depth (m) : 1