2020 Dunant

Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.

Location : Saint Hilaire de Riez / France
Client : Subcom

Product : Fibre optic cable 
Length (km): 5
Water depth (m) : up to 15 m
Vessel : DP Vessel
Burial system : TO Mobile NV (jetting)
Burial depth (m) :

Other projects

  • 2008 KASHAGAN

    Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos
  • 2007 PICOT / GONDWANA

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2016 MARJAN GOSP

    Provision of personnel and equipment to carry out the post-lay burial of one 115 kV power cable.
    Burial system : TM03 (trenching)
    Plus d’infos