Home » Projets » 2016 BBG FUJAIRAH

2016 BBG FUJAIRAH

1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes).

Location : Fujairah (UAE)
Client : ALCATEL LUCENT SUBMARINE NETWORKS Ltd

Product : Fibre optic cable
Length (km): 2.2
Water depth (m) : 0 up to 15 m
Vessel : Not Applicable
Burial system : EBJ (Jetting)
Burial depth (m) :  2
Weight (kg/m) : 3.9
Diameter (mm) : 37.5

Other projects

  • 2024 NIGERIA 2

    Separate landing at Qua Lboe. Laying and post-wiring of 22.4 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2024 NIGERIA

    Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water
    Burial system :
    Plus d’infos
  • 2022 2 AFRICA Spain

    1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos