Home » Projets » 2026 Lumalink

2026 Lumalink

Mobilization of the DP barge in Panama, followed by towed transit to Cayenne (French Guiana). Separate shore-end landing, simultaneous laying and burial of 15 km of fiber optic cable.

Location: Cayenne – French Guiana
Client: ASN
Year: January – July 2026

Length (km): 15 km
Vessel: DP Barge
Burial System: TJV09
Product: Fiber Optic Cable

Other projects

  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos
  • 2021 EAUFON

    Separate shore ends in Chisasibi river. Laying and burial of 19 km of fibre optic cable. Installation of articulated pipes .
    Burial system :
    Plus d’infos
  • 1999 ELGIN FRANKLIN

    Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.
    Burial system : CASTOR 2 (Trencher)
    Plus d’infos