Home » Projets » 1998 VNF SUD FRANCE

1998 VNF SUD FRANCE

Along river – canal / Dual fibre optic cable.

Location : FRANCE / FOS – MONTPELLIER
Client : MCI WORLDCOM / LD COM NETWORKS

Length (km): 90
Water depth (m) : 6,5
Vessel : Spud Barge
Burial system : EBJ 02 (jetting)
Burial depth (m) : 0,5
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 24 mm

Other projects

  • 2018 MERKUR OWF

    Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos
  • 2013 VISCAS SIR BANYAS

    Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
    Burial system : TM04 (trencher)
    Plus d’infos
  • 2023 CFXD

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos