Home » Projets » 2004 SIMIAN SAPHIRE

2004 SIMIAN SAPHIRE

Provision of nearshore trenching services.

Location : Golf of Alexandria – EGYPT
Client : TECHNIP OFFSHORE UK Ltd

Length (km): 3
Water depth (m) : 11
Vessel : Barge
Burial system : TJV06 (Jetting)
Burial depth (m) : 1,5
Product : Flexible pipeline
Weight (kg/m) : 60
Diameter : 2×4″ and 1×10″

Other projects

  • 2008 PERENCO RDC

    Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2020 HAVHINGSTEN System

    Laying and burial of 1 fiber optic cable in Blackpool (UK) and 2 fiber optic cables in Houstrup (Denmark).
    Burial system : TO Mobile NV
    Plus d’infos
  • 2013 ANHOLT

    Post Lay Inspection and Burial of 111 infield power cables
    Burial system : ROVJET806 (jetting)
    Plus d’infos