Home » Projets » 2000 VNF LILLE

2000 VNF LILLE

Along river – canal /1 telecommunication fibre optic cable.

Location : FRANCE
Client : LILLE (Telecom Operators / LD COM NETWORKS)

Length (km): 3,2
Water depth (m) : 10
Vessel : River Barge
Burial system : Machine LD CABLE : Towed plough
Burial depth (m) : 0,7
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 25 mm

Other projects

  • 2017 IFA 2000 CABLES REPAIR

    Repair of 4 power cables being part of the IFA 2000 link .
    Burial system : MED 1 (Dredge pump) + ROVJET806 (jetting)
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2025 2 AFRICA PEARLS KUWAIT

    1 x Direct landing in Kuwait City, shell installation, post-burial.
    Burial system :
    Plus d’infos