Home » Projets » 2001 CROSSING TAT 14

2001 CROSSING TAT 14

PLIB works on telecom FO cable crossings with RTE / NGC power cables

Location : ENGLISH CHANNEL / TAT 14 FO cable system
Client : KDD – SCS

Length (km): 4,3
Water depth (m) : 35
Vessel : DP Vessel
BS : MED1 (Crawler fitted with dredge pump)
Burial depth (m) : 0,4
Product : Fibre optic cable
Weight (kg/m) : 5,8
Diameter : 46 mm

Other projects

  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2024 NIGERIA 2

    Separate landing at Qua Lboe. Laying and post-wiring of 22.4 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2018 ASC Indonesia

    Post lay inspection and burial of 41 km of fibre optic cable.
    Burial system : ROVJET 605 (jetting)
    Plus d’infos