2001 CROSSING TAT 14

PLIB works on telecom FO cable crossings with RTE / NGC power cables

Location : ENGLISH CHANNEL / TAT 14 FO cable system
Client : KDD – SCS

Length (km): 4,3
Water depth (m) : 35
Vessel : DP Vessel
BS : MED1 (Crawler fitted with dredge pump)
Burial depth (m) : 0,4
Product : Fibre optic cable
Weight (kg/m) : 5,8
Diameter : 46 mm