Home » Projets » 2013 AMX COLOMBIA

2013 AMX COLOMBIA

2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.

Location : Barranquilla / Cartagena
Client : Alcatel Lucent

Length (km): 8.5 + 6.5
Water depth (m) : max 14
Vessel : Barge
Burial system : EBJ (jetting)
Burial depth (m) : 1 to 2
Product : Fibre optic cable

Other projects

  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos
  • 2014 PERENCO RDC CONGO

    Laying of 43 km of power cable between mainland / platforms and platforms.
    Burial system : ROVJET806 + EBJ (jetting)
    Plus d’infos
  • 2005 ORASCOM MED CABLE

    MED CABLE direct shore ends (FO)
    Burial system : TJV07 (Jetting)
    Plus d’infos