Home » Projets » 2013 AMX COLOMBIA

2013 AMX COLOMBIA

2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.

Location : Barranquilla / Cartagena
Client : Alcatel Lucent

Length (km): 8.5 + 6.5
Water depth (m) : max 14
Vessel : Barge
Burial system : EBJ (jetting)
Burial depth (m) : 1 to 2
Product : Fibre optic cable

Other projects

  • 2024 MAJAN 1

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2024 2 AFRICA PEARLS

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2011 WALNEY 1

    Post Lay Inspection and Burial of infield power cables
    Burial system : ROVJET605 (jetting)
    Plus d’infos