1998 BELIZE

Main land to island / 34.5 kV power extension.

Location : BELIZE / BOMBA – BOCA CHICA
Client : ALCATEL / BELIZE ELECTRICITY

Length (km): 19,5
Water depth (m) : 3,3
Vessel : Spud Barge
Burial system : TJV04 : Jetting sled
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 22,6
Diameter : 118 mm