Home » Projets » 2016 BBG FUJAIRAH

2016 BBG FUJAIRAH

1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes).

Location : Fujairah (UAE)
Client : ALCATEL LUCENT SUBMARINE NETWORKS Ltd

Product : Fibre optic cable
Length (km): 2.2
Water depth (m) : 0 up to 15 m
Vessel : Not Applicable
Burial system : EBJ (Jetting)
Burial depth (m) :  2
Weight (kg/m) : 3.9
Diameter (mm) : 37.5

Other projects

  • 2001 ULYSSE

    Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).
    Burial system : MED1 (Dredge pump) – ESV12 (Plough)
    Plus d’infos
  • 2021 EAUFON

    Separate shore ends in Chisasibi river. Laying and burial of 19 km of fibre optic cable. Installation of articulated pipes .
    Burial system :
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos