Home » Projets » 2016 BBG FUJAIRAH

2016 BBG FUJAIRAH

1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes).

Location : Fujairah (UAE)
Client : ALCATEL LUCENT SUBMARINE NETWORKS Ltd

Product : Fibre optic cable
Length (km): 2.2
Water depth (m) : 0 up to 15 m
Vessel : Not Applicable
Burial system : EBJ (Jetting)
Burial depth (m) :  2
Weight (kg/m) : 3.9
Diameter (mm) : 37.5

Other projects

  • 2017 IFA 2000 CABLES REPAIR

    Repair of 4 power cables being part of the IFA 2000 link .
    Burial system : MED 1 (Dredge pump) + ROVJET806 (jetting)
    Plus d’infos
  • 2015 ABU ALI

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos