Home » Projets » 2016 BBG FUJAIRAH

2016 BBG FUJAIRAH

1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes).

Location : Fujairah (UAE)
Client : ALCATEL LUCENT SUBMARINE NETWORKS Ltd

Product : Fibre optic cable
Length (km): 2.2
Water depth (m) : 0 up to 15 m
Vessel : Not Applicable
Burial system : EBJ (Jetting)
Burial depth (m) :  2
Weight (kg/m) : 3.9
Diameter (mm) : 37.5

Other projects

  • 2024 MAJAN 1

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2008 DELMA

    Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
    Burial system : TM04 (Trencher)
    Plus d’infos
  • 2015 BALTIC 2

    Provision of personnel and equipment to carry out the post burial of 75 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos