Home » Projets » 2016 BBG FUJAIRAH

2016 BBG FUJAIRAH

1 direct FO shore-end in Fujairah (UAE). Protection of cable (burial and articulated pipes).

Location : Fujairah (UAE)
Client : ALCATEL LUCENT SUBMARINE NETWORKS Ltd

Product : Fibre optic cable
Length (km): 2.2
Water depth (m) : 0 up to 15 m
Vessel : Not Applicable
Burial system : EBJ (Jetting)
Burial depth (m) :  2
Weight (kg/m) : 3.9
Diameter (mm) : 37.5

Other projects

  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2018 TRIANEL BORKUM II OWF

    Provision of personnel and equipment to carry out the post lay burial of 18 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos
  • 2005 PERENCO Gabon

    Mainland to platforms. Surface lay + J-tube Pull-In
    Burial system : N.A.
    Plus d’infos