2022 GRACE HOPPER

Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher

Location: New York USA, Smith Point
Customer: SUBCOM

Length (km): 8.5 km
Water depth (m) :
Vessel: VOS STAR
Beaching system: TMO 4
Beaching depth (m): 1.35 m
Product : Fiber optic cable
cable type: ø37mm