2022 GRACE HOPPER

Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher

Location: New York USA, Smith Point
Customer: SUBCOM

Length (km): 8.5 km
Water depth (m) :
Vessel: VOS STAR
Beaching system: TMO 4
Beaching depth (m): 1.35 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2023 GABON

    Separate landing in Libreville. Laying and post-wiring of 16.9 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2023 BLUE PALERMO

    1 x Direct landing in Palermo, shell installation, post-burial. Installing the grounding system
    Burial system :