2022 GRACE HOPPER

Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher

Location: New York USA, Smith Point
Customer: SUBCOM

Length (km): 8.5 km
Water depth (m) :
Vessel: VOS STAR
Beaching system: TMO 4
Beaching depth (m): 1.35 m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2023 GABON

    Separate landing in Libreville. Laying and post-wiring of 16.9 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2004 SIR BANIYAS

    Lay and burial of 2×9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2008 KASHAGAN

    Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos