2021 HORNSEA 2

Provision of personnel and equipment to carry out the post lay burial of infield array cables.
Place: Hornsea 2 OWF UK waters

Client : Seaway 7
Product : Powercable
Length (km): 366
Water depth (m) : up to 50 m
Vessel : DP Vessel
Burial system : TM05 (trenching)+ROVJET1612 (jetting)
Burial depth (m) : 1.5

Period: May 2021 – May 2022

Other projects

  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos
  • 2020 HAVHINGSTEN System

    Laying and burial of 1 fiber optic cable in Blackpool (UK) and 2 fiber optic cables in Houstrup (Denmark).
    Burial system : TO Mobile NV
    Plus d’infos
  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos