Home » Projets » 2021 HORNSEA 2

2021 HORNSEA 2

Provision of personnel and equipment to carry out the post lay burial of infield array cables.
Place: Hornsea 2 OWF UK waters

Client : Seaway 7
Product : Powercable
Length (km): 366
Water depth (m) : up to 50 m
Vessel : DP Vessel
Burial system : TM05 (trenching)+ROVJET1612 (jetting)
Burial depth (m) : 1.5

Period: May 2021 – May 2022

Other projects

  • 2020 TANNAT and MALBEC Systems

    Separate landing. Laying and burial of 2 fiber optic cables in Las Toninas (Argentina). Installation of shells.
    Burial system : ROVJET 404
    Plus d’infos
  • 2011 WALNEY 2

    Post Lay Inspection and Burial of 51 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2005 ORASCOM MED CABLE

    MED CABLE direct shore ends (FO)
    Burial system : TJV07 (Jetting)