Home » Projets » 2022 2 AFRICA MARSEILLE

2022 2 AFRICA MARSEILLE

2 x Direct landing in Marseilles. Shell installation

Location: Marseille France, Digue du large
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 550 m
Water depth (m) :
Vessel: N/A
Beam system: N/A
Beam depth (m): N/A
Product : Fiber Optic Cable
cable type: ø37mm

Other projects

  • 2023 IEX MARSEILLE

    1 x Direct landing in Marseille, installation of shells, post-sinking, installation of posidonia anchors. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2015 MANIFA

    Provision of personnel and equipment to carry out the trenching of 3 power cables and 2 fiber optic cables.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos