2014 WINTERSHALL

Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.

Location : Dutch sector of North Sea
Client : VBMS

Product : Umbilical
Length (km): 19
Water depth (m) : 30 m
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1
Weight (kg/m) : –
Diameter : 