Home » Projets » 2013 ANHOLT

2013 ANHOLT

Post Lay Inspection and Burial of 111 infield power cables

Location : ANHOLT Offshore Windfarm / Kattegat Sea (DANEMARK)
Client : VSMC/DONG

Product : Power Cable 
Length (km): 141
Water depth (m) : 14 to 20
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1.5 
Weight (kg/m) : max 34
Diameter : max 140 mm

Other projects

  • 2009 IMEWE/MENA/TEN/EIG

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : TO Mobile
    Plus d’infos
  • 2024 MAJAN 1

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2023 GHANA

    Separate landing in Accra. Laying and post-wiring of 4.9 km of fiber optic cable
    Burial system :
    Plus d’infos