Home » Projets » 2016 NORDSEE ONE

2016 NORDSEE ONE

Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.

Location : Nordsee One  Windfarm / North Sea (German waters)
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 62
Water depth (m) : up to 29 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2018 INDIGO

    Post lay inspection and burial of 39 km of fibre optic cable.
    Burial system : ROVJET 605 (jetting)
    Plus d’infos
  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos
  • 2012 CAT – THAÏLAND

    2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.
    Burial system : EBJ 04 + ESV12 (jetting)
    Plus d’infos