2016 NORDSEE ONE
Provision of personnel and equipment to carry out the post lay burial of 54 infield power cables.
Location : Nordsee One Windfarm / North Sea (German waters)
Client : Siem Offshore Contractors
Product : Power Cable
Length (km): 62
Water depth (m) : up to 29 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5
Length (km): 62
Water depth (m) : up to 29 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5
Download the project sheet