Home » Projets » 2014 GÉOCEAN BÉNIN

2014 GÉOCEAN BÉNIN

Laying of 14km of power cable between mainland and a platform. Burial in shallow water from 8m to the beach.
Installation of articulated pipes.

Location : Bénin
Client : GEOCEAN

Length (km): 14 
Water depth (m) : 0 to 26
Vessel : Barge
Burial system : EBJ (jetting)
Burial depth (m) : 1.5
Product : Power cable
Weight (kg/m) : 30
Diameter : 108 mm

Other projects

  • 2009 IMEWE/MENA/TEN/EIG

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : TO Mobile
    Plus d’infos
  • 2024 MORAY WEST

    Assistance to laying
    Burial system :
    Plus d’infos
  • 2008 TAURT FIELD DEVELOPMENT

    Post trenching of subsea umbilical / PLIB
    Burial system : ROVJET401 (Jetting)
    Plus d’infos